Canyon Water Project Expansion
Wanship, Utah
|
|
|
|
|
|
|
|
This
project installed a new 100,000 gallon cast-in-place concrete water
storage tank, a surge tank, vault structure, 30-36 HDPE
pipe, three new 500 HP vertical turbine pumps, and cooling system,
construction of a new booster pump station, cast-in-place concrete
diversion structure and traveling screen on the Weber River, and
modifications to increase the capacity of the existing Lost Canyon
Booster Pump Station.
Project
owner: Weber Basin Water Conservancy District
|
|
|
Parley's
I-215 Crossing and Trail Extension
Salt Lake City, Utah
|
|
|
|
|
A
pedestrian bridge was constructed over I-215 with a trail extension
retained by 25,000 SF of modular block MSE walls. Project included
mass excavation, grading, asphalt paving, barrier, bridge fabrication
and erection, ornamental and chain link fence, noise wall, and traffic
control.
Project
owner: Utah Department of Transportation Region 2
|
|
|
8600
South Storm Drain
Sandy, Utah
|
|
|
|
|
|
|
|
This
project consisted of construction of a new storm drain pipeline
system. It included ten lateral pipelines, associated catch basins,
drop structures, water quality structures, manholes and appurtenances
associated with the storm drain trunk line. Also included were two
precast bridges: one, 70 L.F. and one, 55 L.F. over the East Jordan
and Salt Lake Canals.
Crew
size: 40
Project
owner: Sandy City Corporation
|
|
1300
West Reconstruction
South Jordan City, Utah
|
|
|
|
|
The
project consisted of excavation and grading for a 12" water
line being placed in the center of existing roadway, as well as
road widening, road base, granular borrow, asphalt, bridge extension,
secondary irrigation, culinary water, storm drain, retaining walls,
irrigation, curb and gutter, and sidewalks.
Crew
size: 15
Project
owners: South Jordan City, UT
|

|
|