COP Projects
in Utah



Lost Canyon Water Project Expansion
Wanship, Utah

This project installed a new 100,000 gallon cast-in-place concrete water storage tank, a surge tank, vault structure, 30”-36” HDPE pipe, three new 500 HP vertical turbine pumps, and cooling system, construction of a new booster pump station, cast-in-place concrete diversion structure and traveling screen on the Weber River, and modifications to increase the capacity of the existing Lost Canyon Booster Pump Station.

Project owner: Weber Basin Water Conservancy District



Parley's I-215 Crossing and Trail Extension
Salt Lake City, Utah

A pedestrian bridge was constructed over I-215 with a trail extension retained by 25,000 SF of modular block MSE walls. Project included mass excavation, grading, asphalt paving, barrier, bridge fabrication and erection, ornamental and chain link fence, noise wall, and traffic control.

Project owner: Utah Department of Transportation – Region 2



8600 South Storm Drain
Sandy, Utah

This project consisted of construction of a new storm drain pipeline system. It included ten lateral pipelines, associated catch basins, drop structures, water quality structures, manholes and appurtenances associated with the storm drain trunk line. Also included were two precast bridges: one, 70 L.F. and one, 55 L.F. over the East Jordan and Salt Lake Canals.

Crew size: 40

Project owner: Sandy City Corporation



1300 West Reconstruction
South Jordan City, Utah

The project consisted of excavation and grading for a 12" water line being placed in the center of existing roadway, as well as road widening, road base, granular borrow, asphalt, bridge extension, secondary irrigation, culinary water, storm drain, retaining walls, irrigation, curb and gutter, and sidewalks.

Crew size: 15

Project owners: South Jordan City, UT