This project consisted of removal of the existing bridge and replacement with a new bridge structure. The bridge substructure elements are all precast including abutments, wing walls, sleeper beams and approach slab sections. The bridge also includes 5 new pre-stressed concrete single bulb tee girders. The new bridge structure required the installation of a cofferdam to divert the Weber River. The job also included new catch basins and storm drain piping, final surface grading and rip rap.