This project included the construction of a new 49’x36’ warm vehicle storage building, new 81’x65’ treatment plant building, a Process Solutions Inc. brand sodium hypochlorite generation system (.8% solution) and sodium hypochlorite dosage pump systems. The project also includes injection connections into the new salt brine tanks, as well as water softeners, connected piping and an EFI pre-packaged booster pump station building to increase water pressure for fire protection. Major electrical, site grading, gravel access road to the facility, chain link security fencing, topsoil and seeding are also part of the project.

Project Details

CLIENT: City of Gillette
DURATION:
COST: $5,730,000